Mainz Data Centre

Mainz, Germany  |  22 MW Total Power  |  6,000 m²

Mainz Data Centre - Image 1 Mainz Data Centre - Image 2 Mainz Data Centre - Image 3

FRA1W is one of the most modern and sustainable data centers in Europe, located in Mainz, Germany. The first of three data center buildings on a site area of 25,000 square meters, which will house a total output of 80 MW on 18,000 square meters of whitespace.

This facility is directly connected to Mainz's district heating network, transforming digital heat into green heat. The data center heats cooling water to around 30°C, a large heat pump raises the temperature to up to 125°C, and the heat is fed into Mainz's district heating network via heat exchangers. The system provides up to 60 MW of waste heat for the Mainz district heating network, making a significant contribution to the decarbonization of district heating.

The data center operates with green electricity from renewable energy sources and features Rhine water cooling. The emergency power supply is provided by on-site power plants, eliminating the need for expensive and climate-damaging diesel generators, making the data center emission-free.

Built exclusively to Level 3 standards, all systems are redundant, ensuring extremely high availability. The strategic proximity to the Frankfurt Internet Exchange (DE-CIX) and optimal location on the Ingelheimer Aue provide excellent connectivity and infrastructure advantages.

Stage 5 BIM Scope

Mechanical Package (Comfort Cooling / Critical Cooling / Heating / Ventilation / Smoke Extraction & Fresh Air Systems)

Public Health Package (Domestic / Drainage / Sanitary)

Large Two-Level Basement Plant Room Package

Isometrics Package (Comfort Cooling / Critical Cooling)

Risers Package

Schematics Package

Additional Services: Management / Stage 5 BIM Family Creation / Clash Detection / BWIC & Supports layouts

Stage 6 BIM Scope

As Built Revit & Navisworks Models

As Built Drawings & Schematics

Point Cloud / As Installed Updates

Technical Specifications

Construction Start

Autumn 2023

Phase 1 Completion

Q4 2026

Size

3 buildings with 6,000 m² IT space each

Total Power

80 MW

Operation

Powered by green electricity from renewable energy

Emergency Power

On-site power plants - emission-free, no diesel generators

Cooling

Rhine water cooling system

Waste Heat

Up to 60 MW for Mainz district heating network